Everything covered, from first conversation to final handover.
HVAC & air conditioning
FCU coordination, AC modifications, relocation of supply/return air points, duct routes and access panels.
Ventilation systems
Fresh-air requirements, exhaust and bathroom/kitchen ventilation coordination.
Ductwork
Modification, rerouting, insulation and ceiling coordination around architectural constraints.
Diffusers & grilles
Linear and concealed diffusers integrated with ceilings, curtain tracks and joinery.
MEP coordination
HVAC coordinated with electrical, lighting, plumbing, ceilings, kitchens, wardrobes and joinery.
Testing & handover
Testing, balancing and commissioning coordination, followed by handover documentation.
0+
HVAC coordination projects
0
System types: AC, ventilation, ductwork
0%
Coordinated with design & MEP
Our process for this service.
- 01
Site Assessment
Existing system review and condition survey of AC, ducting and ventilation.
- 02
Interior / Ceiling Coordination
HVAC routes aligned with ceiling design, lighting and joinery early.
- 03
HVAC / MEP Layout
Duct routes, diffuser positions and FCU access planned into the drawings.
- 04
Approval Coordination
HVAC/MEP changes included in the building or authority submission where required.
- 05
Installation
Ductwork, diffusers and equipment installed alongside renovation works.
- 06
Testing & Handover
Testing and balancing coordination, followed by handover documentation.
Crafted with the same care, every hvac, ventilation & mep coordination in dubai project.
A glimpse of the finish quality and attention to detail carried through every stage of the project.
HVAC, Ventilation & MEP Coordination in Dubai completed work and design concepts.
Visuals shown are design concepts and reference imagery for illustrative purposes, not completed G.A.G Interiors projects unless stated otherwise.
HVAC Ceiling Coordination Concept
Ventilation Integration Concept
Ductwork & AC Installation Concept
AC Wall Coordination Concept
Ready to start?
Integrated air-conditioning, ventilation and MEP coordination for apartment, villa and commercial interior projects in Dubai and across the UAE, planned into the design from day one, so ceilings stay clean and airflow stays right.
Get a Free QuoteSee the process come together.
Ceiling and MEP coordination during an ongoing fit-out, ductwork, diffusers and lighting brought together on site.
0+
HVAC coordination projects
0
System types: AC, ventilation, ductwork
0%
Coordinated with design & MEP
A closer look at hvac, ventilation & mep coordination in dubai.
Apartment renovation
AC point relocation, ceiling coordination, diffuser replacement, bathroom ventilation and kitchen-related MEP changes.
Villa renovation
Larger HVAC modifications, ductwork, fresh-air coordination, zoning, multiple FCUs and ceiling integration.
Commercial fit-out
HVAC and ventilation modifications coordinated with revised space planning and fit-out requirements.
Common problems we help you avoid
- AC grille conflicts with wardrobes or curtain tracks
- Inaccessible FCUs after ceiling works
- Insufficient return air
- Duct routes conflicting with lighting layouts
- Poor diffuser placement
- Inadequate bathroom extraction
- Loss of ceiling height from late-stage coordination
Questions about this service.
Our focus is project-based HVAC coordination as part of renovation and fit-out, assessing, modifying and integrating systems within a design, not standalone repair or maintenance callouts.
Yes, relocation of supply and return air points, FCUs and ductwork is planned as part of the interior and ceiling coordination during design.
Where included in the project scope, we coordinate testing, balancing and commissioning ahead of handover documentation.
Other services you may need.
Interior Design & Technical Drawings in Dubai
From first concept to construction-ready drawings, interior design that gets built exactly as envisioned.
NOC & Renovation Approvals in Dubai
Building management, developer and municipal approvals, handled from start to finish, so your project never stalls on paperwork.
Villa & Apartment Renovation and Fit-Out in Dubai
Full-scope renovation and fit-out execution, start to finish, one accountable team on site until handover.